Glossary · Rules and taxes

Preliminary plat

Definition

A preliminary plat is the proposed layout of a subdivision, submitted to the locality's designated agent for tentative approval before a final plat is prepared. Va. Code 15.2-2262 does not prohibit the owner, planners, architects, landscape architects or others with subdivision planning training or experience from preparing it.

Updated September 14, 2026 · Sources · General information, not legal, tax or lending advice
Two drawings

Who draws each plat, and where each one goes after review

The Code does not bar the owner or a planner from drawing a preliminary plat, and if it is approved after review, the approval is tentative and points toward a final plat. A final plat is drawn by a certified professional engineer or land surveyor, and after approval it goes to the clerk to be recorded.

Both are a plat in the statute's sense, the schematic representation of land divided or to be divided. What separates them is the job each one does, and Va. Code 15.2-2262, after requiring an engineer or surveyor for any plat intended for recording, draws the line in one sentence:

However, nothing herein shall be deemed to prohibit the preparation of preliminary studies, plans or plats of a proposed subdivision by the owner of the land, city planners, land planners, architects, landscape architects or others having training or experience in subdivision planning or design.

Va. Code 15.2-2262
The preliminary plat and the final plat, side by side
Point of comparisonPreliminary platFinal plat
Preparer under Va. Code 15.2-2262Not prohibited: the owner, city planners, land planners, architects, landscape architects or others with subdivision training or experienceA certified professional engineer or land surveyor, who certifies the owner's source of title
Carroll County's posted ordinanceNothing precludes preparation by an architect, landscape architect, engineer or land plannerPrepared by a land surveyor licensed by the Commonwealth of Virginia
What happens after reviewTentative approval; the subdivider moves on to a final platApproval, then recording; no clerk may record a required plat before it is approved
A county can ask more of either drawing. Confirm the preparer your county accepts with its subdivision agent.

One approval need not carry the other: Carroll County's posted ordinance says approval of a preliminary plat does not guarantee approval of a final plat for recordation. What the recorded drawing does next is covered under final plat.

After submission

The review a preliminary plat gets, statute and county side by side

The state sets the outer clocks. Under Va. Code 15.2-2260 the designated agent must complete action on a preliminary subdivision plat within 45 days of submission, and all actions, including any state agencies, within a total of 90 days.

Counties publish their own procedure on top of that, and in this footprint Carroll's and Floyd's published procedures read differently from each other and from the statute.

The statute itself lets a locality make preliminary plats mandatory for plats of more than 50 lots, provided a landowner may still submit one by choice for 50 or fewer. How those county procedures compare, whether a given county requires one for a small division, and what an approval holds in place, belong to what a preliminary plat is.

Get started

Sketching a preliminary plat for a tract you plan to divide?

Send Lowell the county, the acreage and the lot layout you have in mind, and he will pull what is recorded on the tract and name who draws the plat and who reviews it. No cost, no obligation.

Office107 Raintree Road, Hillsville, VA 24343
Goes straight to Lowell Bowman.

Got it. Thank you.

We'll be in touch shortly with an honest read.

Questions

Questions about this term

Can a landowner draw a preliminary plat without hiring a surveyor?

Va. Code 15.2-2262 does not prohibit the owner of the land from preparing preliminary studies, plans or plats of a proposed subdivision. A plat intended for recording is different: it must be prepared by a certified professional engineer or land surveyor. Whether a county accepts an owner-drawn preliminary plat under its own ordinance is a question for that county's subdivision agent.

Sources

Where this page's facts come from

Every rule, office and figure above traces to one of these. Rules change; check the office before you act on one.